Published: May 15, 2026
Bartow, Fla. (May 15, 2026) – A portion of Masterpiece Road in Lake Wales is scheduled to close at 8:30 a.m. on Monday, May 18 for underground pipe installation work.
Masterpiece Road will be closed between Saint Helena Road and Timberlane Road until underground pipe installation work is completed. The roadway is expected to reopen at 7 p.m. on Friday, May 22.
Residents are asked to plan alternative routes as needed.
Traffic will be detoured on Timberlane Road and Tindel Camp Road.
The closure is part of a Polk Regional Water Cooperative (PRWC) project.
*All dates/times listed above are subject to change due to circumstances occurring in the field.*