Published: May 2, 2026
Bartow, Fla. (May 2, 2026) – A portion of Ogelthorpe Drive, located within the Laurel Estates Subdivision in Davenport is scheduled to close at 7 a.m. on Monday, May 4 for sanitary water main installation and connection work.
Traffic will be rerouted beginning at the 500 block of Ogelthorpe Drive until sanitary water main installation and connection work is completed. The roadway is expected to reopen at 5 p.m. on Monday, May 18.
The closure is part of an East Group Properties project.
*All dates/times listed above are subject to change due to circumstances occurring in the field.*